Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Corrigendum

Corrigendum

CorrigendumDated 18 Jun 2022No. L-1/261/2021/CERC dated 18.6.2022

Corrects the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page corrigendum from CERC, dated 18 June 2022 (No. L-1/261/2021/CERC), which adds a single sentence to Annexure-I of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 — the "Principal Regulations" — immediately after the table: "GNA for HVDC_SR shall be 6.15 MW ( in addition to the Other Entities included in the above table) " (p1).

Nothing else is changed: the corrigendum does not restate the Annexure-I table, redefine any term, or touch any other provision. It is signed by Secretary Harpreet Singh Pruthi (p1).

A closing note states that the corrigendum "shall be incorporated in the Principal Regulations to be notified in the Gazette" (p1) — so the Principal Regulations were not yet gazetted on the date of issue, and neither the Gazette date nor any commencement date is printed. The added sentence therefore takes effect only through that later gazetted text. Note also that the instrument operates by addition rather than by replacing existing wording.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document