CERC · Central Electricity Regulatory Commission

Approval of Detailed Procedure for metering, accounting and scheduling of entities under the GNA Regulations, 2022

Approval of "Detailed Procedure for metering, accounting and scheduling of the entities under Regulation 5.6, 17.3 and 39.2 of the GNA Regulations"

ProcedureDated 4 May 2026No. L-1/261/2021/CERC dated 04.05.2026

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page CERC order of 4 May 2026 (p1) approves the "Detailed Procedure for metering, accounting and scheduling of the entities under Regulation 5.6, 17.3 and 39.2 of the GNA Regulations", which NLDC submitted on 7 November 2025 after stakeholder consultation (p1). The order recites the parent instrument — the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022, gazetted 19 July 2022 and amended three times (6 April 2023, 1 July 2024, 9 September 2025) — and states that the Commission examined NLDC's draft, made suitable changes and approves it under the proviso to Regulation 39.2, with the approved text enclosed as an Annexure (p2).

The annexed procedure first fixes who it covers: entities seeking connectivity at an ISTS bay already allocated to another entity under Regulation 4.1, and GNA grantees under Regulation 17.1(iii) interconnecting at such a bay or at a generating station switchyard, subject to a bar on dual inter-State and intra-State connectivity in these configurations (p3).

Section 3 allocates duties. CTUIL communicates approved connectivity/GNA quantum to NLDC/RLDCs; eligible entities register separately with the host RLDC and pay RLDC fees and charges, schedule directly or through a Lead Generator, Lead ESS or QCA, sign a mutual agreement covering common-infrastructure sharing and sub-ISTS congestion management, may nominate a Principal entity for scheduling and de-pooling of DSM charges, file that agreement with the RLDC and RPC, indemnify the RLDCs, furnish meter data and an affidavit of applicable PPA rates under Sections 62 and 63, and comply with CEA Grid Standards and the Grid Code; RLDCs facilitate registration, scheduling and metering; RPCs publish the DSM, RTDA, reactive energy, ancillary service and congestion accounts and the REA/RTA (pp3–5).

Section 4 places scheduling and metering at the ISTS interconnection point, caps individual schedules at granted connectivity or GNA, defines co-located entities, requires interface meters and a metering scheme aligned to the CEA Meters Regulations 2006 and the Grid Code, assigns payment liability for deviation, congestion, transmission deviation and reactive energy charges, and routes curtailment through Regulation 38 of the GNA Regulations (pp5–7). Section 5 sets loss treatment inside versus outside the ISTS interconnection point (p7). A sample ISTS pooling station illustration with assumptions and worked calculations of DSM/congestion, RTDA and reactive energy follows (pp8–10).

Standard name
Connectivity and GNA Regulations
Primary topics
Metering, Energy accounting and settlement, Scheduling and despatch

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.