Connectivity and General Network Access (First Amendment) Regulations, 2023 — Public Notice — Draft

Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023.

Notice extending the date for comments on a draftDated 27 Jan 2023L-1/261/2021/CERC dated 27

Notice extending the date for comments on the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page CERC public notice dated 27 January 2023 (p1) announcing that the Commission has prepared the Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023, and has posted them on its website.

The operative content is paragraph 2 (p1): notice is given under section 178(3) of the Electricity Act, 2003 read with the Electricity (Procedure for Previous Publication) Rules, 2005, inviting comments, suggestions and objections from stakeholders and interested persons. These may be emailed to the Secretary and a named officer at the addresses given, or, for registered users, uploaded through the SAUDAMINI portal via the e-Regulation link on the e-filing home page, on or before 17 February 2023. A helpdesk contact is given for portal queries.

Paragraph 3 (p1) states that comments received after the stipulated date may not be considered while finalising the regulations. The notice does not summarise or reproduce the proposed amendments, and states no date of coming into force.

Standard name
Connectivity and GNA Regulations

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document