CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Extension of comment deadline — Public Notice

Extension of date for seeking comments/suggestions on Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024.

Notice extending the date for comments on a draftDated 30 Aug 2024No. L-1/261/2021/CERC dated 30th August 2024

Notice extending the date for comments on the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's Public Notice No. L-1/261/2021/CERC dated 30 August 2024 extends the deadline for stakeholder comments on the Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024 (p1). Comments had been invited by an earlier notice dated 31 July 2024, with a last date of 2 September 2024; at the request of stakeholders that date is now moved to 17 September 2024 (p1).

The notice sets out how responses are to be filed — by email to two named Commission addresses, or by registered users through the SAUDAMINI Portal via the e-Regulation link on the e-filing Home Page, with an e-Court helpdesk available for upload queries (p1). It warns that comments received after the stipulated date may not be considered while the regulations are finalised (p1). The notice is purely procedural: it neither reproduces nor alters the draft amendments themselves.

Standard name
Connectivity and GNA Regulations

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document