Connectivity and General Network Access to the inter-State Transmission System Regulations, 2021 — Draft

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2021

Published with a draftDated 16 Dec 2021No. L-1/261/2021/CERC dated 16.12.2021

Published with the Workshop notice on Draft Connectivity and General Network Access Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's draft Connectivity and General Network Access (GNA) Regulations, 2021, issued on 16.12.2021 (p1). It proposes a single access framework for the inter-State transmission system (ISTS), replacing the 2009 Connectivity Regulations and the 2008 Open Access Regulations together with their detailed procedures (p1, pp43–44). The draft will come into force on a date CERC notifies, and different provisions may start on different dates (p1).

Chapter 1 (pp1–5) sets the title, commencement and definitions. It defines the new access products — Connectivity, GNA and Temporary GNA (T-GNA) — and a wide set of linked terms, including Associated Transmission System (ATS), Energy Storage System (ESS), Lead ESS/Lead Generator, Renewable Energy Generating Station (REGS), Renewable Hybrid Generating Station (RHGS), National Open Access Registry (NOAR), Nodal Agency, Standing Clearance and intra-State entity.

Chapter 2 (Regulation 3, pp5–6) prescribes the online application process to the Nodal Agency for Connectivity or GNA, application fees, scrutiny and deficiency cure, closure and forfeiture/refund, monthly batching and inter-se priority.

Chapter 3 (Regulations 4–16, pp6–16) covers Connectivity. It sets eligibility thresholds for generating stations (including REGS and ESS), captive generating plants, standalone ESS, renewable power park developers and specified 5 MW-and-above applicants seeking access through an existing generator's electrical system; rules for application quantum; interconnection study and identification of ATS; in-principle and final grant; the three-part Connectivity Bank Guarantee (Conn-BG1, Conn-BG2, Conn-BG3); the Connectivity Agreement; quarterly monitoring; dedicated transmission lines and terminal bays; infirm power and start-up power; interface meters; transfer and splitting of Connectivity; and return or encashment of bank guarantees.

Chapter 4 (Regulations 17–23, pp16–21) covers GNA. It lists who may apply, including STUs on behalf of intra-State entities, buying entities, distribution licensees or bulk consumers connecting directly to ISTS with a load of 50 MW and above, cross-border trading licensees and transmission licensees for auxiliary power. It creates deemed GNA on commencement for States and existing entities based on historical ISTS drawal and existing Long Term Access/Medium Term Open Access, provides for additional GNA applications by STUs and others, system study, grant, one-time GNA charge and use of GNA by other GNA grantees.

Chapter 5 (Regulations 24–25, pp21–23) deals with relinquishment of Connectivity and GNA, including notice, revised grants, encashment of bank guarantees and relinquishment charges.

Chapter 6 (Regulations 26–35, pp23–33) establishes T-GNA: eligibility, NOAR functions, application categories (advance, exigency and collective), processing timelines, grant, SLDC Standing Clearance, revision, scheduling, transmission charges and information through NOAR.

Chapter 7 (Regulation 36, pp33–34) specifies how transmission corridor is allocated among GNA grantees, T-GNA advance applicants, collective transactions and exigency/real-time market users.

Chapter 8 (Regulations 37–44, pp34–45) contains transition arrangements from the old Connectivity and Open Access regimes, curtailment hierarchy, directions for CTU and NLDC to issue detailed procedures, payment of transmission charges and losses, power to relax and remove difficulties, repeal and savings, and CERC's power to issue suo motu orders and practice directions. Annexure-I (pp46–48) gives the state/entity-wise historical data and calculation of deemed GNA and explanations, including special treatment for Haryana and for export to Bangladesh.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Open access charges

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.