Approval of Detailed Procedure for Declaration of State-wise Solar and Non-solar Hours under the GNA Regulations

Approval of "Detailed Procedure for Declaration of State-wise (or part thereof) Solar hours and Non-solar hours" under the GNA Regulations

ProcedureDated 25 May 2026No. L-1/261/2021/CERC dated 25.05.2026

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC approves, and encloses as an Annexure, the Detailed Procedure for Declaration of State-wise (or part thereof) Solar hours and Non-solar hours that NLDC (Grid-India) submitted on 11.11.2025 after stakeholders' consultation. The order (pp1-2) recites the parent Connectivity and General Network Access Regulations, 2022 and their first three amendments, records that the Commission examined the submission and incorporated suitable changes, and brings the approved procedure into effect from the date of issuance of the order, 25.05.2026.

The Annexure (pp3-6) is the operative text. Sections 1-3 quote the enabling provisions, set the scope as all applicable entities under the GNA Regulations, and leave definitions to the Act and other Commission or CEA regulations (pp3-4). Section 4 is the core: it fixes a weekly determination-and-declaration cycle for solar and non-solar hours for each State or part thereof, based on REMC week-ahead forecasts aggregated across that State's ISTS solar plants, with a fallback to the preceding seven days' aggregated schedules where the forecast is unavailable, and defines solar hours as the non-zero-generation time blocks (p4). Times for data availability and for publication of the compiled declaration on the NLDC website are specified, in the Appendix-A format.

Section 4.2 governs how scheduling rights under GNA are shared during the first three and last three time blocks of solar hours where non-solar-hour connectivity has been carved out of another entity's solar-hour access, illustrated by a worked example; it preserves scheduling of balance power under T-GNA, routes over-injection to the DSM Regulations, and disapplies the sharing rule where the matching non-solar access has not been granted or is not effective (pp4-6). Section 4.4 deals with States that presently have no ISTS-connected solar generation. Sections 5-6 add an indemnity running in favour of SLDCs/RLDCs/NLDC and a revision route whereby Grid-India/NLDC revises the procedure with stakeholder consultation and submits it for the Commission's information, while the Commission may direct modification (p6). Appendix-A is the blank declaration table (p7).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Scheduling and despatch

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document