Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2025 — Draft

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2025.

Draft amendmentDated 3 Mar 2025No. L-1/261/2021/CERC dated 03.03.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission has issued a draft notification dated 03.03.2025 proposing the Fourth Amendment Regulations, 2025 to the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 (p1). It is drafted as operative regulations: it will commence on publication in the Official Gazette, whose date is not printed, and it states it is made after previous publication (p1).

The first operative part amends Regulation 2.1 by inserting definitions for entities with restricted access, restricted access, solar hours and non-solar hours, with solar hours to be declared weekly by NLDC for each state (p1–2). A new Regulation 5.2a lays down conditions for additional generation capacity under Regulation 5.2, covering connectivity bank guarantees, commercial operation dates, documents and compliance with other regulations, plus transitional duties for applicants already approved or in process (p2–3). Regulation 5.8 is amended to require a Renewable Power Park Developer to furnish the scheduled commercial operation date before final connectivity and to disclose promoters and shareholding (p4).

The core new framework is Regulation 5.11, which creates restricted access for wind-based REGS or ESS at ISTS substations, and for solar/RHGS entities that seek or already hold connectivity; it mandates conversion of certain existing solar or hybrid grants, gives examples, and says that a non-solar-hour quantum below 50 MW will not be converted or granted restricted access (p4–6). Amendments to Regulation 11A restrict changes in shareholding and control up to commercial operation, with approval and revocation consequences (p6–7). Regulation 19.2's proviso on additional GNA quantum is substituted (p7), and Regulation 24.6's revocation trigger for Renewable Power Park developers is replaced (p7).

Annexure-IV supplies modalities: sharing of dedicated transmission systems and charges, connectivity bank guarantee and one-time GNA charge sharing, lead generator or QCA arrangements, publication by the Nodal Agency of cost references and substation/bay lists, and NLDC's weekly notification of solar and non-solar hours (p7–11). A closing Note records the gazette publication of the Principal Regulations and the First and Second Amendments (p12).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Energy storage deployment, Scheduling and despatch

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.