CERC · Central Electricity Regulatory Commission

Procedure in respect of Regulation 11C of the Connectivity and General Network Access Regulations, 2022 — Approval Order

Approval of 'Procedure in respect of Regulation 11C' of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022.

ProcedureDated 9 Jun 2026No. L-1/261/2021/CERC dated 09.06.2026

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A CERC order (No. L-1/261/2021/CERC) dated 09.06.2026, signed by Chairperson Jishnu Barua and Members Ramesh Babu V., Harish Dudani and Ravinder Singh Dhillon, approving the 'Procedure in respect of Regulation 11C' of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022. The order is two pages; the approved procedure is annexed and runs from p3 to p12. It takes effect from the date of issuance of the order (p2); no Gazette date is printed.

Pages 1–2 give the background: the GNA Regulations were notified on 7 June 2022 and amended three times, the third amendment inserting Regulation 11C and amending Regulation 39.1 to require CTU to submit the 11C procedure for approval after stakeholder consultation. CTU and CTUIL submitted drafts and a comprehensive Detailed Procedure by letters between January and April 2026. Crucially, the Commission approves only the Regulation 11C procedure; the other procedures (including under Regulation 2.1(h-i)) were merely noted for information, and the Commission reserves the right to direct modifications (p2).

The annexed procedure is an operational rulebook for reallocating terminal bay capacity that falls vacant at an ISTS substation. Clauses 1–3 set the purpose, the priority ordering by time-and-date stamp of applications, and the triggering events — closure, revocation, relinquishment, re-arrangement under Regulation 11.4 and other margin-creating incidents — with provisos for electrically isolated substation sections and substations built under multiple transmission schemes (p3–4). Clauses 4 and 7–8 place the reallocation exercise in the queue relative to change-of-source applications, RoFR applications, fresh grants and the transition under the third amendment (p4–5, p7). Clause 5, with two worked illustrations, requires the nature of access (solar hour or non-solar hour) to be preserved and the reallocation to be capped at the vacated margin (p5–6).

Clause 6 requires CTU to publish vacancies on its website within a fixed number of working days and treats cumulative vacancies below 50 MW as informational only, although an existing grantee at the same substation may seek enhancement (p6). Clause 9 creates the consent mechanism; clause 10 the eligible class of grantees within the same Cluster, with a matching matrix; clause 11 the eligibility cut-offs and the cut-off-date rules for each type of vacation event (p7–10). Clauses 12–13 shift commercial responsibility for the vacancy gap onto the outgoing entity and its bank guarantees and bar compensation claims (p10). The remaining clauses cover revised connectivity bank guarantees, shared bays, continuity and advancement of start dates, cumulative margins and release of unused margin to fresh applicants (p11–12).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Transmission tariff

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document