Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Fourth Amendment, 2026 — Draft

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2026

Draft amendmentDated 20 May 2026No. L-1/261/2021/CERC dated 20.05.2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft text of the Fourth Amendment to CERC's Connectivity and General Network Access (GNA) to the inter-State Transmission System Regulations, 2022 (p1). It is issued after previous publication under s.178 of the Electricity Act, 2003, and would take effect from the date of publication of the final regulations in the Official Gazette (p1). Its 27 clauses walk through the Principal Regulations in order, mainly tightening bank-guarantee, land-document and financial-closure discipline for entities seeking ISTS connectivity, while creating some withdrawal and relaxation routes.

Clauses 1–3 (pp1–2) give the short title and commencement, insert a definition of 'LAND BG' into Regulation 2.1, and add Regulation 3.10, letting an entity withdraw its full connectivity quantum with return of all bank guarantees where the gap between the likely start date in the in-principle grant and the start date in the final grant is two years or more, provided the request reaches the Nodal Agency within 30 days of the final grant.

Clauses 4–9 (pp2–3) deal with generation and storage access: a minimum discharge requirement tied to connectivity quantum, a new Regulation 4.7 route for non-solar-hour-only access, a proviso that capacity installed to meet technical compliances at the point of injection is not counted towards connectivity, several changes to Regulation 5.2 (including new sub-clauses on REGS installed to charge an ESS, on relinquishment flowing from the existing grantee, and on relaxations where additional capacity is for technical compliance), and a minimum-discharge proviso for ESS under Regulation 5.4.

Clause 10 (pp3–5) rewrites the Regulation 5.8(xi) provisos on multi-located renewable projects using LOA/PPA and land documents across locations, with a worked illustration table, sets a bank guarantee rate for ESS other than pumped storage, and brings renewable power park developers into clause (xii).

Clauses 11–14 (pp5–6) touch interconnection studies and timelines (Regulations 6.3, 7.2), shorten the source-change window in Regulation 9.3 and allow a second source change for a fee, and rework Regulation 11A on land and financial-closure deadlines, conversion from land/financial-closure-based connectivity to LOA/PPA-based connectivity, and who may hold connectivity.

Clauses 15–21 (pp7–8) add Regulation 15.4 on change in control, change when Conn-BGs are returned (Regulation 16.2), delete Regulation 17.1(iv), create Regulation 17.5 for drawee entities connecting between ISTS and intra-state transmission or distribution systems, delete Regulations 20.2 and 22.2(c), amend Regulation 22.2(d) and Regulation 22.4(a) on deemed COD where CTU issues a completion certificate, and add Regulation 23A on transfer of GNA where the load itself is sold.

Clauses 22–27 (pp9–10) delete Regulation 26.1(b) and a proviso to Regulation 28.5, rename 'Connection Agreement' as 'Connectivity Agreement' in Regulation 37.10, add a transitional Regulation 37.11 requiring return of Conn-BG2 and Conn-BG3 where a year from COD has passed, direct the Nodal Agency to revise the Detailed Procedure within 60 days, and add a rule to Annexure-IV on processing timelines for multiple applications. A closing Note (p10) lists the gazette publication dates of the Principal Regulations and the First to Third Amendments.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Energy storage deployment

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.