Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and GNA Third Amendment Regulations, 2025 — Corrigendum

CENTRAL ELECTRICITY REGULATORY COMMISSION CORRIGENDUM

CorrigendumDated 4 Nov 2025Published in the Gazette 13 Nov 2025F. No. L-1/261/2021/CERC dated 4th November, 2025

Corrects the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC issued this one-page corrigendum on 4 November 2025 to fix five drafting slips in the CERC (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2025, notified on 31 August 2025 and gazetted on 9 September 2025 (p2).

Each correction is pinned to a page of that gazetted notification. At page 58 (Regulation 9.3.1) and page 67 (first proviso to Regulation 11C(1)(b)) the phrase "effective date of GNA" is replaced by "firm Start date of Connectivity"; at page 68 (Regulation 11C(1)(d)) the same phrase takes the word "firm"; at page 66 the title of Regulation 11A(6) is widened to add "or Renewable power park developer" after "ESS (excluding PSP)"; and at page 76, under Regulation 25.1(b-i), encashment of Conn-BG3 is qualified to the relinquished quantum (p2).

No commencement, savings or transitional clause is given. The corrigendum was signed by the Secretary and appears in the Gazette of India Extraordinary, Part III, Section 4, No. 734, dated 13 November 2025 (p1).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document