CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access Regulations, 2022 — Removal of Difficulties (Second Order), 2023

Removal of Difficulties (Second Order) in giving effect to certain provisions of Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022.

OrderDated 29 Sep 2023Petition No. 13/SM/2023 dated 29.09.2023

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short suo motu order of the Central Electricity Regulatory Commission, passed on 29.09.2023 in Petition No. 13/SM/2023, exercising its removal-of-difficulties power under the GNA Regulations, 2022 (p1, pp2–3). It records that the GNA Regulations come into effect from 01.10.2023, and that the Commission had already issued clarifications and practice directions by order dated 22.09.2023 in Petition No. 11/SM/2023 (p1).

CTUIL then wrote on 29.09.2023 saying that generators with commercial operation date as on 01.10.2023 must apply for transition/connectivity and submit a connectivity bank guarantee to CTU, but that only a few working days remained between the earlier order and the start of GNA scheduling; that many guarantees were defective; and that, because these projects already transact under STOA, power could be bottled up for want of guarantees. CTUIL asked for a 15-day extension (pp1–2).

The Commission accepted that power should not be bottled up for want of formalities but held that guarantees must still be filed within a fixed time. It directs that such generators be given time till 16.10.2023 to submit the required Bank Guarantees, subject to filing an undertaking; on receipt of the undertaking, CTU is to grant provisional permission till 16.10.2023 and RLDC/NLDC may consider that quantum for scheduling under deemed T-GNA. Permission is to stand withdrawn if the guarantee is not deposited by that date (p2). The order also notes the treatment of guarantees with minor and major defects, and disposes of the petition (p3).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document