Connectivity and General Network Access to the inter-State Transmission System (Second Amendment) Regulations, 2024 — Draft

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024

Draft amendmentDated 16 Feb 2024No. L-1/261/2021/CERC dated 16.02.2024

Draft

A proposal that has since been finalised as the Connectivity and GNA Regulations, 2022 — Second Amendment, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC draft notification dated 16 February 2024 (p1) proposing the Second Amendment to the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 — referred to throughout as "the Principal Regulations". It sets out the amending text but states that it takes effect only on a date the Central Commission notifies (p1), so the draft itself has no operative commencement date.

Clause 2 inserts a definition of "Renewable Energy Implementing Agency" — an entity designated by the Central or a State Government to act as intermediary procurer of renewable power for sale to distribution licensees or other entities, working under Ministry of Power, MNRE or State guidelines (p1–2). Clause 3 lengthens a post-application procedural period in Regulation 3.5 (p2). Clause 4 adds an NER-specific floor, setting the minimum installed capacity for applying for connectivity in the North Eastern Region at 25 MW (p2). Clause 5 rewrites the land-related compliance alternatives in Regulation 5.8 for both renewable power park developers and renewable generation / storage applicants — a bank guarantee in lieu of ownership, lease or land-use rights over part of the land, or a government allotment order with possession documents for the whole land — cross-referring to Regulations 11A and 11B (p2–3). Clauses 6 and 7 lengthen the periods in Regulations 7.1 and 7.2 (p3).

Clause 8 is the substantive core: it substitutes clauses (1)–(3) of Regulation 11A, fixing when land documents, an auditor's certificate on equity infusion and financial closure must be delivered relative to the scheduled date of commercial operation, and how far those timelines stretch where an SCOD extension is granted by a REIA or distribution licensee (p4–5). A new Clause (5) allows an applicant whose LoA or PPA is terminated for reasons not attributable to it to convert connectivity from the LoA/PPA route to the land route, with balance quantum revoked on partial conversion and no reconversion permitted (p5–6). Clause 9 adjusts Regulation 11B so that the land-related bank guarantee is what is referred to and what is forfeited on revocation (p6). Page 7 is a Note recording where the Principal Regulations and the First Amendment were gazetted.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document