CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access (First Amendment) Regulations, 2022 — Explanatory Memorandum — Draft

Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2022

Explanatory memorandum to a draftDated 13 Feb 2023No. L-1/261/2021/CERC dated 13.02.2023

Explanatory memorandum to the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This explanatory memorandum accompanies a draft First Amendment to CERC's Connectivity and General Network Access (GNA) Regulations, 2022 (the Principal Regulations, notified 7.6.2022). It sets out the background, the suggestions received from the Ministry of Power, TANGEDCO, APCC/APPCC and CTUIL, and the specific text CERC proposes to insert or substitute in the Principal Regulations (p1–2).

Pages 2–5 address squatting on connectivity. Responding to MoP's letter of 26.9.2022, CERC proposes amendments to Regulation 5.8 to require renewable generators, energy storage systems (excluding pumped storage) and renewable power park developers to show land rights and equity release or LOA/PPA; a new Regulation 9.3 sets financial-closure deadlines tied to the start date of connectivity, with bank-guarantee encashment on failure; and a new Regulation 24.6 provides for revocation of connectivity where COD is missed or an LOA/PPA is terminated (pp2–5).

Pages 5–15 deal with direct drawal by a State through the intra-State network from regional-entity generating stations. After setting out SRPC/TCC deliberations and the LTA sub-group methodology, CERC proposes a new Regulation 18.3 and Annexure-II to compute 'direct drawal' blockwise and reduce deemed GNA for sharing of ISTS charges, while retaining Annexure-I GNA for scheduling. Worked examples follow, including an NLC Stage-1 sample month (pp10–15).

Pages 15–27 cover the remaining CTUIL and stakeholder suggestions: substitution of Regulation 5.2 to allow additional capacity or ESS owned by another entity within existing connectivity under a Lead Generator/Lead ESS; amendments to Regulations 7.1, 7.2, 8.2 and 8.3 on augmentation of the common ISTS; a proviso to Regulation 15.1 for bulk consumers' subsidiaries; a proviso to Regulation 16.2 and new Regulation 16.5 on return of Conn-BG2/Conn-BG3; new clause 17.1(vi) and related clauses 22.2(b-ii) and 18.1(f) for intra-State injecting entities and conversion of LTA; new Regulations 20.4 and 26.4 creating RE-only GNA (GNARE) and T-GNA (T-GNARE); new clause 22.2(b-i); a substituted Regulation 25.1 on GNA relinquishment with a longer notice period and revised charges; an explanation under Regulation 34.2 on segregating collective-transaction schedules; amendments to Regulation 37 on MTOA of trading licensees; a proviso to Regulation 40.2 exempting one-time GNA charges for already-commissioned capacity; and corrected West Bengal data in Annexure-I (pp15–27).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Transmission tariff, Network planning and investment

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document