Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Second Amendment, 2024

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024

Amendment · Gazette copyDated 19 Jun 2024Published in the Gazette 1 Jul 2024No. L-1/261/2021/CERC dated the 19th June, 2024

The Gazette copy of the Connectivity and GNA Regulations, 2022 — Second Amendment, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to CERC's Connectivity and General Network Access (GNA) to the inter-State Transmission System Regulations, 2022. The notification is dated 19 June 2024 and was published in the Gazette on 1 July 2024 (p1, p5), but it does not itself bring the changes into force: clause 1.1 leaves commencement to a separate Commission notification (p6), so the operative date is not fixed by this document.

The amendments work through the connectivity-application lifecycle. Regulation 2.1 gains a definition of "Renewable Energy Implementing Agency" (REIA), covering government-designated intermediary procurers and governments procuring renewable power, tied to Central Government Section 63 guidelines (p6). Regulation 3.5 is replaced with a procedure for scrutinising applications at the nodal agency: timelines for intimating minor deficiencies, for the applicant to rectify them, and for closure and part-forfeiture of the application fee, plus a duty on CTU to publish a list of minor deficiencies (p6). Regulation 4.1 gains a new clause setting a minimum installed capacity, alone or in aggregate, for applying for connectivity in the North Eastern Region and Sikkim (p6).

Regulation 5.8's land-proof and bank-guarantee alternatives for two categories of applicant are substituted, including a route for states where the government allots land to a nodal agency and issues an advance possession letter (p6–7). Regulations 7.1 and 7.2 extend two existing timelines (p7). Regulation 11A is substantially rewritten: it fixes deadlines for submitting land documents, for achieving financial closure, and for converting connectivity from one sub-clause of Regulation 5.8 to another, with the consequences of conversion and of partial conversion (p7–8). Regulation 11B now governs encashment of the bank guarantee and revocation on failure to meet financial closure (p8), and Regulation 24.6 gains a rule on the scheduled date of commercial operation for converted connectivity (p9).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (4)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document