CERC · Central Electricity Regulatory Commission

Approval of Detailed Procedure for Connectivity and GNA under the GNA Regulations, 2022

Approval of 'Detailed Procedure for Connectivity and GNA' under Regulation 39.1 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022.

ProcedureDated 14 Oct 2022No. L-1/261/2021/CERC dated 14th October, 2022

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC order dated 14 October 2022 approving CTU’s Detailed Procedure for Connectivity and General Network Access to the inter-State transmission system (p1). The GNA Regulations were notified on 7 June 2022, and CTU submitted the procedure with formats on 30 September 2022 (p1). The Commission approves the procedure with changes, but approval is given only to the Detailed Procedure: the Procedure for Regulation 21 and the formats are merely noted for information, and CTU may modify them after stakeholder consultation (p2). CTU is directed to publicise the approved procedure, and it may close the portal for fresh applications under the 2009 Connectivity Regulations after advance notice (pp2–3). The procedure is effective from the date the GNA Regulations come into effect, which is not printed here (p3).

The annexed procedure applies to processing of applications for connectivity and/or GNA to the ISTS (p5). It covers application formats, affidavits, eligibility, lead-generator and sharing agreements, application fees, and additional-capacity requests (pp5–7); interconnection studies by the nodal agency and identification of Associated Transmission Systems and common network expansion (pp7–8); in-principle grant and milestone consequences (pp8–9); connectivity bank guarantees (pp9–10); final grant and connectivity agreement, including technical data scrutiny and physical connection (pp10–11); monitoring, JCC meetings, and bay-allocation status (p12); dedicated transmission lines and terminal bays, including a voltage-wise minimum-capacity table (pp12–13); infirm power, start-up power, interface meters, transfer of connectivity, and treatment of connectivity bank guarantees (pp13–14).

The GNA part covers eligibility, deemed grant based on legacy LTA/MTOA/LTOA/CGS allocations, applications by STUs and non-STU entities, system study, and grant of GNA (pp14–17). It sets out application requirements and NoC conditions for use of GNA by other grantees, including a regional-balancing constraint and an illustrative regional-sum table (pp17–20). It addresses relinquishment of connectivity and GNA (p20) and transition arrangements under Regulation 37, including DVC stations and entities from the 2009 Connectivity Regulations (pp20–22). Appendices A and B provide flowcharts for connectivity application processing and transition (pp23–25).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Network planning and investment

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document