Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and GNA Regulations, 2022 — Fourth Amendment, 2025 — Explanatory Memorandum — Draft

Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2025

Explanatory memorandum to a draftDated 12 Mar 2025No. L-1/261/2021/CERC dated 12.03.2025

Explanatory memorandum to the Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Explanatory Memorandum, dated 12.03.2025, to the draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2025 (p1). It explains why the Commission proposes to amend the 2022 GNA Regulations and includes proposed text for the changes, rather than being the notified amendment itself.

The background states that the GNA Regulations were notified in 2022 and amended in 2023 and 2024, with a draft third amendment issued on 31.07.2024 (p1). The Fourth Amendment is driven by four issues: solar-hour/non-solar-hour access, restrictions on change of ownership/shareholding, CTUIL's concern over revocation of Renewable Power Park Developer connectivity, and STU requests for multiple GNA start dates (pp1–2).

Part A (pp1–19) is the largest. It proposes to convert solar-based REGS and solar-plus-other RHGS into "Entities with restricted Access", with injection scheduling rights limited to solar hours or non-solar hours depending on the underlying source, and to release balance non-solar capacity to wind/ESS entities (pp6–8). It explains affected entity types, the minimum 50 MW threshold for conversion and new connectivity (p8), transitional treatment of existing applicants and grantees (p9), CTUIL publication duties (pp9–10), routes for wind/ESS applicants to connect at vacant or shared bays (pp10–12), sharing of access and dedicated transmission infrastructure through lead generator or QCA arrangements (pp12–17), sharing of Conn-BGs (pp16–17), and auxiliary/charging drawal and ancillary services (pp8, 17). It also amends Regulation 5.2 and inserts Regulation 5.2.a to require Conn-BGs, SCOD and milestone compliance for additional capacity, including pending applications (pp18–19).

Part B (pp19–22) proposes a new Clause (6) in Regulation 11A to restrict changes in controlling ownership/shareholding of a connectivity grantee or SPV until COD, with a nodal-agency approval route and revocation/encashment for breach, drawing on SECI RfS conditions (pp20–21).

Part C (pp22–24) concerns Regulation 19.2 and an order in Petition No. 434/MP/2024. It proposes allowing an STU to seek additional GNA for different quantums from multiple specified start dates in a financial year, subject to a cap for processing ease (pp23–24).

Part D (pp24–26) addresses Regulation 24.6 and CTUIL's letter on RPPD connectivity. It proposes requiring the RPPD to furnish SCOD of generating stations before final connectivity and revises the revocation trigger to link it to effective GNA and COD failure (pp25–26).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Scheduling and despatch, Energy storage deployment

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document