Connectivity and GNA Regulations, 2022 — Fourth Amendment, 2025 — Explanatory Memorandum — Draft
Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2025
Explanatory memorandum to a draftDated 12 Mar 2025No. L-1/261/2021/CERC dated 12.03.2025
Draft
The draft has since been finalised as the Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026.
Explanatory memorandum to the Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2025 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Explanatory Memorandum, dated 12.03.2025, to the draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2025 (p1). It explains why the Commission proposes to amend the 2022 GNA Regulations and includes proposed text for the changes, rather than being the notified amendment itself.
The background states that the GNA Regulations were notified in 2022 and amended in 2023 and 2024, with a draft third amendment issued on 31.07.2024 (p1). The Fourth Amendment is driven by four issues: solar-hour/non-solar-hour access, restrictions on change of ownership/shareholding, CTUIL's concern over revocation of Renewable Power Park Developer connectivity, and STU requests for multiple GNA start dates (pp1–2).
Part A (pp1–19) is the largest. It proposes to convert solar-based REGS and solar-plus-other RHGS into "Entities with restricted Access", with injection scheduling rights limited to solar hours or non-solar hours depending on the underlying source, and to release balance non-solar capacity to wind/ESS entities (pp6–8). It explains affected entity types, the minimum 50 MW threshold for conversion and new connectivity (p8), transitional treatment of existing applicants and grantees (p9), CTUIL publication duties (pp9–10), routes for wind/ESS applicants to connect at vacant or shared bays (pp10–12), sharing of access and dedicated transmission infrastructure through lead generator or QCA arrangements (pp12–17), sharing of Conn-BGs (pp16–17), and auxiliary/charging drawal and ancillary services (pp8, 17). It also amends Regulation 5.2 and inserts Regulation 5.2.a to require Conn-BGs, SCOD and milestone compliance for additional capacity, including pending applications (pp18–19).
Part B (pp19–22) proposes a new Clause (6) in Regulation 11A to restrict changes in controlling ownership/shareholding of a connectivity grantee or SPV until COD, with a nodal-agency approval route and revocation/encashment for breach, drawing on SECI RfS conditions (pp20–21).
Part C (pp22–24) concerns Regulation 19.2 and an order in Petition No. 434/MP/2024. It proposes allowing an STU to seek additional GNA for different quantums from multiple specified start dates in a financial year, subject to a cap for processing ease (pp23–24).
Part D (pp24–26) addresses Regulation 24.6 and CTUIL's letter on RPPD connectivity. It proposes requiring the RPPD to furnish SCOD of generating stations before final connectivity and revises the revocation trigger to link it to effective GNA and COD failure (pp25–26).
Read with this
The regulation
Amendments and corrections
- Dated 18 Jun 2022Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Corrigendum
- Dated 1 Apr 2023Connectivity and General Network Access to the inter-State Transmission System (First Amendment) Regulations, 2023
- Dated 31 Aug 2023Corrigendum to the Order dated 14 October 2022 on the Detailed Procedure for Connectivity and GNA
- Dated 19 Jun 2024Connectivity and GNA Regulations, 2022 — Second Amendment, 2024
- Dated 31 Aug 2025Connectivity and GNA to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
- Dated 4 Nov 2025Connectivity and General Network Access (Third Amendment) Regulations, 2025 — Corrigendum
- Dated 4 Nov 2025Connectivity and GNA Third Amendment Regulations, 2025 — Corrigendum
- Dated 11 Nov 2026Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026
Commencement notices and reasons
- Dated 9 Oct 2022Gazette - effective date 15.10.2022
- Dated 9 Oct 2022Notification — effective date 15.10.2022
- Dated 1 Apr 2023GNA Regulations commencement notification — effective date 5.4.2023
- Dated 1 Apr 2023Gazette — effective date 5.4.2023
- Dated 3 Aug 2023GNA Regulations, 2022 and First Amendment Regulations, 2023 — commencement notification, effective 1.10.2023
- Dated 3 Aug 2023GNA Regulations, 2022 — commencement notification, effective 1.10.2023
- Dated 4 Jul 2024Gazette — effective date 15.07.2024 (Gazette No. 518)
- Dated 4 Jul 2024Connectivity and GNA Second Amendment Regulations, 2024 — commencement notification
- Dated 31 Jul 2024Connectivity and GNA Regulations, 2022 — First Amendment, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 14 Oct 2022Approval of Detailed Procedure for Connectivity and GNA under the GNA Regulations, 2022
- Dated 22 Sep 2023Connectivity and GNA Regulations, 2022 — Removal of Difficulties (First Order), 2023
- Dated 29 Sep 2023Connectivity and General Network Access Regulations, 2022 — Removal of Difficulties (Second Order), 2023
- Dated 29 Sep 2023Detailed Procedure for Allocation of Transmission Corridor for GNA and T-GNA Scheduling under GNA Regulations, 2022 — 2023
- Dated 1 Oct 2023Connectivity and GNA Regulations, 2022 — Removal of Difficulties (Third Order), 2023
- Dated 7 Oct 2023Connectivity and General Network Access Regulations, 2022 — Fourth Removal of Difficulties Order
- Dated 8 Dec 2025Connectivity and General Network Access Regulations, 2022 — Removal of Difficulties Order, 2025
- Dated 4 May 2026Approval of Detailed Procedure for metering, accounting and scheduling of entities under the GNA Regulations, 2022
- Dated 25 May 2026Approval of Detailed Procedure for Declaration of State-wise Solar and Non-solar Hours under the GNA Regulations
- Dated 9 Jun 2026Procedure in respect of Regulation 11C of the Connectivity and General Network Access Regulations, 2022 — Approval Order
- Dated 10 Jul 2026Treatment of LoA-based Connectivity under GNA Regulations, 2026 — Order
- Dated 14 Aug 2026Procedure for Levying Compensation Charges for Additional Time to Achieve Milestones under the GNA Regulations, 2022
Consolidated copies, for reference (1)
Other copies of these documents (5)
- Dated 7 Jun 2022Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- Dated 1 Apr 2023Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023
- Dated 19 Jun 2024Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Second Amendment, 2024
- Dated 31 Aug 2025Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
- Dated 11 Nov 2026Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026
Earlier drafts
- Dated 27 Jan 2022Workshop notice on Draft Connectivity and General Network Access Regulations, 2021
- Dated 16 Dec 2021File: Connectivity and General Network Access to the inter-State Transmission System Regulations, 2021 — Draft
- Dated 16 Dec 2021Notice extending the date for comments: Public Notice on Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2021
- Dated 14 Jan 2022Notice extending the date for comments: Draft Connectivity and GNA Regulations, 2021 — Public Notice (Extension-I) — comments deadline extended
- Dated 26 Jan 2022Explanatory memorandum: Draft Connectivity and GNA Regulations, 2021 — Explanatory Memorandum
- Dated 16 Feb 2022Hearing notice: Public hearing notice on Draft Connectivity and General Network Access Regulations, 2021 — hearing 07.03.2022
- Dated 16 Feb 2022Notice extending the date for comments: Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2021 — Comments Deadline Extension-II, 2022
- Dated 27 Jan 2023Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023 — Draft
- Dated 27 Jan 2023Notice extending the date for comments: Connectivity and General Network Access (First Amendment) Regulations, 2023 — Public Notice — Draft
- Dated 13 Feb 2023Explanatory memorandum: Connectivity and General Network Access (First Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
- Dated 16 Feb 2023Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Connectivity and General Network Access (First Amendment) Regulations, 2023
- Dated 27 Feb 2023Hearing notice: Public hearing notice — Draft Connectivity and General Network Access (First Amendment) Regulations, 2023
- Dated 16 Feb 2024Connectivity and General Network Access to the inter-State Transmission System (Second Amendment) Regulations, 2024 — Draft
- Dated 16 Feb 2024Public notice: Connectivity and General Network Access (Second Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 5 Mar 2024Explanatory memorandum: Draft Connectivity and General Network Access to the inter-State Transmission System (Second Amendment) Regulations, 2023 — Explanatory Memorandum
- Dated 13 Mar 2024Hearing notice: Public hearing notice — Connectivity and General Network Access (Second Amendment) Regulations, 2024
- Dated 31 Jul 2024Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2024 — Draft
- Dated 31 Jul 2024Explanatory memorandum: Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Explanatory Memorandum — Draft
- Dated 31 Jul 2024Public notice: Draft Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Public Notice
- Dated 30 Aug 2024Notice extending the date for comments: Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Extension of comment deadline — Public Notice
- Dated 26 Sep 2024Hearing notice: Connectivity and General Network Access (Third Amendment) Regulations, 2024 — public hearing notice
- Dated 3 Mar 2025Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2025 — Draft
- Dated 3 Mar 2025Public notice: Connectivity and GNA (Fourth Amendment) Regulations, 2025 — Draft — Public Notice
- Dated 28 Mar 2025Hearing notice: Public hearing notice on Draft Connectivity and General Network Access (Fourth Amendment) Regulations, 2025
- Dated 15 Apr 2026GNA Milestone Extension Compensation Procedure, 2022 — Draft
- Dated 1 May 2026Notice extending the date for comments: Public hearing notice on GNA milestone-extension compensation charges under the Connectivity and GNA Regulations, 2022
- Dated 6 May 2026Treatment of GNA LoA-Route Connectivity Where PPA Not Signed Within 12 Months — Draft Order, 2026
- Dated 13 May 2026Hearing notice: Public hearing notice — GNA connectivity where PPA not signed within 12 months of LoA, 2026
- Dated 20 May 2026Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Fourth Amendment, 2026 — Draft
- Dated 20 May 2026Public notice: Connectivity and GNA (Fourth Amendment) Regulations, 2026 — Public Notice — Draft
- Dated 2 Jun 2026Hearing notice: Public hearing notice on Draft Connectivity and General Network Access (Fourth Amendment) Regulations, 2026
- Dated 16 Jun 2026Explanatory memorandum: Connectivity and GNA (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 22 Jun 2026Notice extending the date for comments: Connectivity and GNA (Fourth Amendment) Regulations, 2024 — comment deadline extension notice
16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.