Notification — effective date 15.10.2022

Notification - effective date 15.10.2022

Commencement noticeDated 9 Oct 2022Published in the Gazette 7 Jun 2022No.L-1/261/2021/CERC dated 9 th October, 2022

Commencement notice for the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 or one of its amendments. The dates are in the notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This two-page CERC notification is a commencement notice. It switches on the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 in part, and holds the rest of the transition in place.

It records that the GNA Regulations were gazetted on 07.06.2022 (Part-III, Section-4, No. 364) and that Regulation 1.2 left the commencement date to be notified by the Commission, with different dates permissible for different regulations (p1). The operative paragraphs then do three things.

First, they bring the GNA Regulations into operation from 15.10.2022, but carve out Regulations 23 to 24, 26 to 36, 37.9, 38, 40 and 43, whose commencement will be notified separately (p1). Second, they defer fresh applications for connectivity and GNA, and their processing and grant, to a date to be notified separately (p1). Third, they keep the pre-existing arrangements running until further notification: scheduling and despatch continue on the LTA, MTOA and STOA quantum of each Designated ISTS Customer and other grid users under the Indian Electricity Grid Code Regulations, 2010 (p1); STOA continues to be granted under the Open Access in inter-State Transmission Regulations, 2008 and the Detailed Procedures thereunder (p2); and billing, collection and disbursement of inter-State transmission charges and losses continue under the Sharing Regulations, 2020 (p2).

For an analyst, this is the map of what is live in the GNA transition and what is not: the connectivity, GNA application and commercial-settlement machinery is expressly still on the old framework, with no date set for the switchover.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Transmission tariff

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document