CERC · Central Electricity Regulatory Commission

Connectivity and GNA Regulations, 2022 — Second Amendment, 2024

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024

AmendmentDated 19 Jun 2024No. L-1/261/2021/CERC dated 19.06.2024

Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The second amendment to CERC's 2022 Connectivity and GNA Regulations, issued on 19 June 2024. It carries ten amending clauses plus a closing Note, and it does not fix its own start date: clause 1.2 leaves commencement to a later Commission notification (p1).

The first pair of changes works on the front end of the connectivity queue. A new definition of "Renewable Energy Implementing Agency" (REIA) is inserted into Regulation 2.1, covering government-designated intermediary procurers, governments procuring renewable power for their own use, and procurement done under Central Government guidelines issued under section 63 (p1–2). Regulation 3.5 is replaced with a scrutiny-and-cure procedure: the nodal agency must flag minor deficiencies within a stated working-day window, the applicant gets a short cure period, and a closed application forfeits part of the fee with the balance refunded; CTU is to publish and keep updated a list of what counts as a minor deficiency, and anything else is treated as incomplete and rejected (p2).

Clauses 4 and 5 address who may apply and what land proof is required. A new Regulation 4.1(f) sets a lower eligibility floor, stating that "the minimum installed capacity individually or with an aggregate installed capacity to apply for a grant of Connectivity shall be 25 MW in North Eastern Region (NER) and Sikkim" (p3). Regulation 5.8(vii)(b)–(c) and (xi)(b)–(c) are substituted to spell out what counts as proof of land rights — registered title deed, lease or land use rights for 50% of the land required, or a bank guarantee in lieu on a capacity-linked scale — and to accept state government land-allotment orders with advance possession letters in states where land is routed through a nodal agency (p3–4).

Clauses 6 and 7 lengthen two procedural timelines in Regulations 7.1 and 7.2 (p4). Clause 8 replaces the whole of Regulation 11A, restating the deadlines for submitting land documents after in-principle or final grant of connectivity, the financial-closure milestone, the cap on extensions flowing from SCOD slippage, and a one-way route for converting PPA-backed connectivity to the land-bank-guarantee route, with balance quantum revoked (p5–7). Clause 9 rewrites Regulation 11B so that missing financial closure triggers revocation and encashment of the relevant bank guarantees (p7). Clause 10 inserts a sub-clause into Regulation 24.6 fixing the date from which the clock runs for converted connectivity (p7–8). The closing Note records the gazette publication of the principal regulations and the first amendment (p8).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Fees payable to the Commission

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.