Skip to content

CERC · Central Electricity Regulatory Commission

Draft Connectivity and GNA Regulations, 2021 — Explanatory Memorandum

Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2021. Explanatory Memorandum

Explanatory memorandum to a draftDated 26 Jan 2022No. L-1/261/2021/CERC dated 26th January 2022

Explanatory memorandum to the Workshop notice on Draft Connectivity and General Network Access Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is CERC's Explanatory Memorandum dated 26 January 2022 accompanying the draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2021 (p1). It explains why CERC proposes to move from the 2009 Connectivity Regulations' point-to-point LTA/MTOA framework towards a General Network Access (GNA) model built around Connectivity, GNA and Temporary GNA (T-GNA). It is not the regulation itself; it reproduces proposed clauses and gives worked illustrations.

The Background (pp1–3) recounts the 2004 open access regulations, the 2009 Connectivity Regulations, the Sharing Regulations of 2010 and 2020, comments from CEA, CTU, POSOCO and IPPs, the 2014 Staff Paper, the Mata Prasad Committee, the 2017 draft GNA Regulations, and later renewable connectivity and ISTS-charge developments. The memorandum then summarises the three proposed sections: Connectivity (A), GNA (B) and T-GNA (C) (pp3–5).

For Connectivity (pp6–21), it explains proposed eligibility, quantum rules including lead generator/lead ESS and renewable hybrid generating stations, dual ISTS/intra-State connectivity, use of an existing generator's electrical system, additional capacity within existing connectivity, interconnection study by CTU, removal of Stage-I/Stage-II for renewables, dedicated transmission lines, Connectivity Bank Guarantees and their encashment/return, the Connectivity Agreement, and transfer/splitting of connectivity. For GNA (pp22–47), it explains payment of transmission charges by buying entities, scheduling flexibility, the indicative 'within the region'/'outside the region' split, eligible applicants, deemed GNA for States and named entities (DVC, Haryana, HVDCs, BARC, Railways, Essar Steel), GNA for injecting entities and cross-border trading, additional GNA for STUs, one-time GNA charges, use of GNA by other grantees, relinquishment, and T-GNA through NOAR. Corridor allocation is at pp50–52. Transition treatment for existing Connectivity/LTA/MTOA/STOA is tabulated at pp52–61. Annexure-I (pp62–63) surveys international sharing of network operator charges and quotes a PJM report. No commencement date is stated; an illustration assumes 31.3.2022 (p42).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Transmission tariff

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document