Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and GNA Second Amendment Regulations, 2024 — commencement notification

Notification – effective date 15.07.2024

Commencement noticeDated 4 Jul 2024Published in the Gazette 1 Jul 2024No. L-1/261/2021/CERC dated 04.07.2024

Commencement notice for the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 or one of its amendments. The dates are in the notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page CERC notification that does nothing except fix the date on which an already-notified amendment starts to operate. It records that the CERC (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024 were published in the Gazette of India Extraordinary on 1.07.2024 (p1), and that Regulation 1.2 of those regulations left commencement to a date to be notified by the Commission (p1). Exercising that, the Commission notifies that the Second Amendment Regulations come into force with effect from 15.07.2024 (p1). The notification is dated 04.07.2024 and signed by the Secretary (p1). It sets out no substantive obligation, procedure or parameter; its only content is the commencement trigger, so an analyst should read it alongside the Second Amendment Regulations themselves, not in place of them.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document