Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and GNA Regulations, 2022 — Removal of Difficulties (Third Order), 2023

Removal of Difficulties (Third Order) in giving effect to certain provisions of Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022.

OrderDated 1 Oct 2023Petition No. 15/SM/2023 dated 1.10.2023

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a suo motu CERC order (Petition No. 15/SM/2023, dated 1.10.2023), described in its own heading as the Third Order for removal of difficulties in giving effect to the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 — the 'GNA Regulations'. It is issued just as the remaining GNA provisions take effect from 01.10.2023, and follows earlier orders of 22.09.2023 (Petition 11/SM/2023) and 29.09.2023 that had already clarified some difficulties (p1–2). It responds to fresh difficulties raised by CTUIL and Grid-India by letters, and to clarificatory requests from other stakeholders (p1–2).

The order is organised as four numbered issues, each with the submission, the relevant regulation extracted verbatim, and the Commission's direction. Issue 1 (p2–4) concerns Indian Railways' GNA at ISTS drawal points in the Northern Region, confirming that its 130 MW deemed GNA may be used across its named ISTS interfaces, consistent with the Commission's 2015 order treating a State's directly-ISTS-connected TSSs as a single 'fragmented control area'. Issue 2 (p4–5) deals with what happens to the land Bank Guarantee furnished in lieu of land documents when a connectivity application is closed for failure to furnish Conn-BG1/2/3 — the Commission directs its return within a stated period. Issue 3 (p5–7) grants Grid-India a two-month transition dispensation (from 1.10.2023) to continue collecting T-GNA transmission charges under the existing practice while software is aligned, after which the GNA Regulations timelines apply. Issue 4 (p7–8) extends the window for STUs to apply for additional GNA beyond the original Regulation 19.1 deadline.

The closing part (p8–9) sets out the source of power — Regulation 42 (power to remove difficulty) read with Regulation 44 (suo moto orders and practice directions) — and disposes of the petition in terms of the directions given (p8–9).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Transmission tariff

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document