Connectivity and GNA (Fourth Amendment) Regulations, 2025 — Draft — Public Notice

Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2025.

Public notice on a draftDated 3 Mar 2025No. L-1/261/2021/CERC dated 3.03.2025

Public notice on the Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page public notice from the Central Electricity Regulatory Commission, issued on 3 March 2025, opening stakeholder consultation on a set of draft amendment regulations for connectivity and general network access to the inter-State transmission system (p1).

The Commission states that it has prepared Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations and has posted them on its website (p1). Notice is given under Section 178(3) of the Electricity Act, 2003 read with the Electricity (Procedure for Previous Publication) Rules, 2005, inviting comments, suggestions and objections from stakeholders and interested persons (p1).

Submissions are to reach the Secretary on or before 3 April 2025 by email, or, for registered users, through the e-Regulation link on the SAUDAMINI Portal's e-filing home page; a helpdesk number is given for upload queries (p1). The notice warns that comments received after the stipulated date may not be considered when the regulations are finalised (p1). It sets no substantive connectivity, access or transmission norms itself — it only opens the consultation window, names the channels and fixes the deadline.

Standard name
Connectivity and GNA Regulations

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document