CERC · Central Electricity Regulatory Commission

Gazette — effective date 5.4.2023

Gazette - effective date 5.4.2023

Commencement noticeDated 1 Apr 2023Published in the Gazette 6 Apr 2023F. No. L-1/261/2021/CERC dated 1st April, 2023

Commencement notice for the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 or one of its amendments. The dates are in the notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short CERC notification that fixes the dates on which parts of the General Network Access (GNA) framework actually start operating. Its recitals record that the GNA Regulations, 2022 were gazetted on 19.7.2022 (p2); that Regulation 1.2 lets the Commission notify commencement, with different dates for different provisions (p2); that a notification of 14.10.2022 brought some provisions into force from 15.10.2022 (p2); and that the First Amendment Regulations, 2023 were issued on 1.4.2023 (p2).

In partial modification of the 14.10.2022 notification, the operative paragraphs (a)–(g) (p2–3) make 5.4.2023 the trigger date. The First Amendment Regulations commence then, except a listed set of amended regulations and new regulations which are carved out (p2); Regulations 40.2–40.4 and 43.1(a)–(b) take effect then (p2); the provisions on fresh Connectivity and GNA applications, their processing and grant take effect then (p2); and the effective date of Regulations 37.1–37.8 is moved to 5.4.2023 in place of 15.10.2022, with options to be exercised afresh on the basis of entities' status as on 5.4.2023 (p2).

The tail of the notification is a holding arrangement: scheduling and despatch, the grant of STOA, and the billing, collection and disbursement of inter-State transmission charges and losses continue on the existing LTA/MTOA/STOA basis under the Indian Electricity Grid Code 2010, the 2008 Open Access regulations and the 2020 Sharing regulations respectively, until further notification (p2–3).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Scheduling and despatch

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.