Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access (Second Amendment) Regulations, 2024 — Public Notice — Draft

Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024

Public notice on a draftDated 16 Feb 2024No. L-1/261/2021/CERC dated 16th February 2024

Draft

The draft has since been finalised as the Connectivity and GNA Regulations, 2022 — Second Amendment, 2024.

Public notice on the Connectivity and General Network Access to the inter-State Transmission System (Second Amendment) Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page public notice from the Central Electricity Regulatory Commission (p1). It announces that the Commission has prepared the Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2024, framed under Section 178 and other enabling provisions of the Electricity Act, 2003, and that the draft has been posted on the Commission's website (p1).

The notice then invites comments, suggestions and objections from stakeholders and interested persons under Section 178(3) of the Act read with the Electricity (Procedure for Previous Publication) Rules, 2005 (p1). Responses are to reach the designated officers by email, or be uploaded through the SAUDAMINI Portal's e-Regulation link for registered users, by 8 March 2024; a helpdesk number is given for portal queries (p1). The notice warns that comments received after the stipulated date may not be considered when the regulations are finalized, and is signed by the Secretary (p1).

The notice itself contains no regulatory text: it neither reproduces the draft nor describes what provisions the Second Amendment would change. Its value is procedural — it fixes the consultation window and the channel for submitting comments on the draft GNA amendment.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document