Public hearing notice on Draft Connectivity and General Network Access (Fourth Amendment) Regulations, 2025

Public hearing on Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2025

Hearing notice on a draftDated 28 Mar 2025No. L-1/261/2021/CERC dated 28.03.2025

Hearing notice on the Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's Secretary issues a one-page public notice (p1) convening an online public hearing on the Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2025. It records that the draft was issued on 3 March 2025 and that written comments, objections and suggestions were due by 3 April 2025 (p1).

The hearing is fixed for 09.04.2025 at 10:00 AM, in online/video mode, for representatives of Central and State Utilities, CPSUs, CTUs, STUs, NGOs, IPPs and Financial Institutions (p1). Organisations wishing to attend must send the names of proposed participants by 07.04.2025 and indicate whether they will make a presentation; presentations are to run 5 to 10 minutes over 8 to 10 slides, with advance copies emailed to the two addresses given (p1).

The notice is procedural only. It creates no rights, obligations or regulatory parameters of its own; the substantive content sits in the draft amendment on which it consults.

Standard name
Connectivity and GNA Regulations

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document