CERC · Central Electricity Regulatory Commission

Gazette - effective date 15.10.2022

Commencement noticeDated 9 Oct 2022Published in the Gazette 14 Oct 2022F.No. L-1/261/2021/CERC dated 9th October, 2022

Commencement notice for the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 or one of its amendments. The dates are in the notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page CERC notification (p2) that switches on the Connectivity and General Network Access (GNA) Regulations, 2022 — themselves gazetted on 07.06.2022 — from 15.10.2022, but only partially. Clause (a) brings the GNA Regulations into operation from that date while holding back a listed set of provisions (Regulations 23–24, 26–36, 37.9, 38, 40 and 43) for a commencement date to be notified separately. Clause (b) defers fresh applications for connectivity and GNA, and their processing and grant, to a date yet to be notified.

Until those steps occur, the notification keeps the pre-existing regime running. Clauses (c)–(e) provide that scheduling and despatch continues to be based on LTA/MTOA/STOA under the 2010 Indian Electricity Grid Code, that STOA continues to be granted under the 2008 Open Access in inter-State transmission Regulations and their Detailed Procedures, and that billing, collection and disbursement of inter-State transmission charges and losses continues under the 2020 Sharing Regulations — each "till further notification" (p2).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Scheduling and despatch

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document