Skip to content

CERC · Central Electricity Regulatory Commission

Workshop notice on Draft Connectivity and General Network Access Regulations, 2021

Workshop/discussion on Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2021.

Draft regulationDated 27 Jan 2022

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC Secretariat notice dated 27 January 2022 convening stakeholder workshops on the draft CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2021, which the Commission had notified on 16 December 2021 while inviting comments and suggestions (p1). Because the draft proposes new concepts, CERC says interactive sessions will be held on Microsoft Teams to build understanding and resolve stakeholder queries, and that a separate discussion will be held with officials of the Ministry of Power, CEA, POSOCO and CTU (p1).

Annexure-I (p2) sets out the schedule: four sessions on 3, 10, 14 and 16 February 2022, grouped by constituency — generating stations, ISTS transmission licensees, trading licensees and power exchanges; then DISCOMs, RLDCs, RPCs, SERCs, SLDCs and STUs of the Northern and Western Regions; then the Eastern and Southern/North-Eastern Regions; and finally CTU. The same annexure carries the meeting link and QR code and a naming convention for participants logging in as guests.

Recipients are asked to nominate two to three representatives and confirm by 2 February 2022 (p1). The remainder of the document (pp3–15) is the mailing list: named generating companies, transmission licensees, traders, exchanges and associations, and the regional and state-level bodies by region. Nothing in it states regulatory obligations; it is a consultation-logistics document.

Standard name
Connectivity and GNA Regulations

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document