Draft Connectivity and General Network Access to the inter-State Transmission System (Second Amendment) Regulations, 2023 — Explanatory Memorandum

Explanatory Memorandum of Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Second Amendment) Regulations, 2023

Explanatory memorandum to a draftDated 5 Mar 2024No. L-1/261/2021/CERC dated 5.03.2024

Draft

The draft has since been finalised as the Connectivity and GNA Regulations, 2022 — Second Amendment, 2024.

Explanatory memorandum to the Connectivity and General Network Access to the inter-State Transmission System (Second Amendment) Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is CERC's explanatory memorandum for the draft Second Amendment to the Connectivity and General Network Access (GNA) Regulations, 2022, dated 5 March 2024 (p1). It explains why CERC proposes to amend the GNA Regulations, which were notified on 7 June 2022, first amended on 1 April 2023, and made effective from 5 April 2023 except for some provisions effective from 1 October 2023 (p1). The memorandum records suggestions from the Ministry of Power, CTUIL, renewable-energy developers and associations, and then sets out proposed changes in four groups (p1–4).

Group A covers connectivity application and grant issues. It proposes longer scrutiny timelines: deficiencies to be intimated within eighteen days, and in-principle connectivity within 60 or 90 days depending on whether ATS augmentation is required, amending Regulations 3.5, 7.1 and 7.2 (p5). It reduces the minimum capacity for NER to 25 MW and creates a bank-guarantee formula for land-route applicants up to and above 1000 MW, amending Regulation 5.8 and 11B (p5–7). It also makes a State Government land-allotment order, accompanied by 100% possession, an eligible land document (p7–8).

Group B revises timelines for land documents and pre-COD milestones: land documents within 18 months of in-principle grant or 12 months of final grant, whichever is earlier; 10% equity infusion and financial closure at least 12 months before SCOD, with SCOD extension capped at 12 months beyond the initial SCOD (p8–10). Group C allows connectivity granted on the LoA/PPA route to convert to land route on termination not attributable to the applicant, with no conversion back and revocation of balance quantum if only part is converted (p10–12). Group D adds a definition of Renewable Energy Implementing Agency to Regulation 2.1 (p12). Because it is a memorandum, it explains the rationale and quotes proposed clauses; it does not itself bring the amendments into force.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document