Skip to content

CERC · Central Electricity Regulatory Commission

Public hearing notice on Draft Connectivity and General Network Access (Fourth Amendment) Regulations, 2026

Public hearing on Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2026

Hearing notice on a draftDated 2 Jun 2026No. L-1/261/2021/CERC dated 02.06.2026

Hearing notice on the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Fourth Amendment, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page CERC public notice, dated 02.06.2026, convening an oral public hearing on the draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2026 (p1). It records that the draft was issued on 20 May 2026 and that the comment window closed on 22 June 2026, and that a hearing has now been decided upon (p1).

The hearing is fixed for 23.06.2026 at 3:00 PM, held online by video, and is addressed to representatives of Central and State Governments, Load Despatch Centres, NGOs, IPPs and financial institutions (p1). The Commission asks invitees to attend or depute a conversant officer, to send the names of proposed participants by 19.06.2026, and to indicate whether they will present; presentations are to run 5–10 minutes across no more than 4–5 slides, with advance copies emailed to the addresses given (p1).

Standard name
Connectivity and GNA Regulations

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document