Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and GNA (Fourth Amendment) Regulations, 2024 — comment deadline extension notice

Extension of date for seeking comments/suggestions on Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2024.

Notice extending the date for comments on a draftDated 22 Jun 2026No. L-1/261/2021/CERC dated 22.06.2026

Notice extending the date for comments on the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Fourth Amendment, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page public notice from the CERC Secretary extending the window for stakeholder comments on a draft amendment to the Connectivity and General Network Access to the inter-State Transmission System Regulations (p1). Comments were originally invited by 22.06.2026 under a notice dated 20.05.2026; at stakeholders' request the last date is now 29.06.2026 (p1). Submissions go to two named CERC email addresses, or for registered users through the SAUDAMINI Portal's e-Regulation link, with an e-Court helpdesk for upload queries (p1). The notice states that comments received after the stipulated date may not be considered while the regulations are finalised (p1). The subject line calls the draft the Fourth Amendment while the body refers to the Third Amendment (p1).

Standard name
Connectivity and GNA Regulations

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document