CERC · Central Electricity Regulatory Commission
Treatment of GNA LoA-Route Connectivity Where PPA Not Signed Within 12 Months — Draft Order, 2026
Mechanism for treatment of connectivity granted under the GNA Regulations based on the LoA where the PPA has not been signed within a period of 12 months from the date of issuance of the LoA
Draft orderDated 6 May 202611/SM/2026 dated 06.05.2026
Draft
A proposal that has since been finalised as the Treatment of LoA-based Connectivity under GNA Regulations, 2026 — Order.
Summary
Summary written by software. Check the regulator's original before you rely on it.
CERC Draft Order, Petition No. 11/SM/2026 — This is a draft order by the Central Electricity Regulatory Commission proposing a one-time mechanism for connectivity granted on the Renewable Energy Implementing Agency (REIA) Letter of Award (LoA) route under the GNA Regulations where the PPA has not been signed within 12 months of the LoA (p1). It is issued for stakeholder comments before a final order.
The main order (pp1–8) records the background: the GNA Regulations 2022 and their first three amendments; the LoA route intended to convert into PPA/PSA; the 25.11.2025 Staff Paper with three options; and comments from 30 stakeholders. It quotes the existing GNA provisions on withdrawal of applications, relinquishment and revocation of connectivity (pp2–5), and the Ministry of Power OM dated 16.04.2026 suggesting one-time surrender without BG forfeiture, auction of freed capacity, revenue to CTUIL and application to legacy LoAs as on 31.03.2025 (p5).
The Commission invokes Regulations 41 and 42 of the GNA Regulations and proposes the detailed mechanism in Annexure-I (pp6–7). It invites comments by 21.05.2026 and a public hearing by separate notice, and says a final order will follow (pp7–8). It also directs REIAs—NTPC, NHPC, SJVN and SECI—and CTUIL to furnish data on unconverted LoAs within specified days (p8).
Annexure-I (pp9–21) defines which entities are covered and requires CTUIL to publish a list; covered entities must choose within one month among three options. Option-I allows exit from the LoA route while retaining connectivity, subject to a performance bank guarantee and land, financial closure and COD milestones (pp9–12). Option-II allows substitution of LoA1 with a PPA under another LoA2, with limits on SCOD and NOC requirements (pp12–14). Option-III allows surrender of connectivity with return of Conn-BGs (pp14–15). Failure to choose is treated as Option-III (p15). Freed-up connectivity is first offered for reallocation in the same cluster and then auctioned; the Annexure sets auction modalities, bid security, milestone timelines and use of auction proceeds (pp15–20), with an illustration (pp20–21). Annexure-II (pp22–24) summarises stakeholder comments on the staff paper options.
Read with this
The regulation
Amendments and corrections
- Dated 18 Jun 2022Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Corrigendum
- Dated 1 Apr 2023Connectivity and General Network Access to the inter-State Transmission System (First Amendment) Regulations, 2023
- Dated 31 Aug 2023Corrigendum to the Order dated 14 October 2022 on the Detailed Procedure for Connectivity and GNA
- Dated 19 Jun 2024Connectivity and GNA Regulations, 2022 — Second Amendment, 2024
- Dated 31 Aug 2025Connectivity and GNA to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
- Dated 4 Nov 2025Connectivity and General Network Access (Third Amendment) Regulations, 2025 — Corrigendum
- Dated 4 Nov 2025Connectivity and GNA Third Amendment Regulations, 2025 — Corrigendum
- Dated 11 Nov 2026Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026
Commencement notices and reasons
- Dated 9 Oct 2022Gazette - effective date 15.10.2022
- Dated 9 Oct 2022Notification — effective date 15.10.2022
- Dated 1 Apr 2023GNA Regulations commencement notification — effective date 5.4.2023
- Dated 1 Apr 2023Gazette — effective date 5.4.2023
- Dated 3 Aug 2023GNA Regulations, 2022 and First Amendment Regulations, 2023 — commencement notification, effective 1.10.2023
- Dated 3 Aug 2023GNA Regulations, 2022 — commencement notification, effective 1.10.2023
- Dated 4 Jul 2024Gazette — effective date 15.07.2024 (Gazette No. 518)
- Dated 4 Jul 2024Connectivity and GNA Second Amendment Regulations, 2024 — commencement notification
- Dated 31 Jul 2024Connectivity and GNA Regulations, 2022 — First Amendment, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 14 Oct 2022Approval of Detailed Procedure for Connectivity and GNA under the GNA Regulations, 2022
- Dated 22 Sep 2023Connectivity and GNA Regulations, 2022 — Removal of Difficulties (First Order), 2023
- Dated 29 Sep 2023Connectivity and General Network Access Regulations, 2022 — Removal of Difficulties (Second Order), 2023
- Dated 29 Sep 2023Detailed Procedure for Allocation of Transmission Corridor for GNA and T-GNA Scheduling under GNA Regulations, 2022 — 2023
- Dated 1 Oct 2023Connectivity and GNA Regulations, 2022 — Removal of Difficulties (Third Order), 2023
- Dated 7 Oct 2023Connectivity and General Network Access Regulations, 2022 — Fourth Removal of Difficulties Order
- Dated 8 Dec 2025Connectivity and General Network Access Regulations, 2022 — Removal of Difficulties Order, 2025
- Dated 4 May 2026Approval of Detailed Procedure for metering, accounting and scheduling of entities under the GNA Regulations, 2022
- Dated 25 May 2026Approval of Detailed Procedure for Declaration of State-wise Solar and Non-solar Hours under the GNA Regulations
- Dated 9 Jun 2026Procedure in respect of Regulation 11C of the Connectivity and General Network Access Regulations, 2022 — Approval Order
- Dated 10 Jul 2026Treatment of LoA-based Connectivity under GNA Regulations, 2026 — Order
- Dated 14 Aug 2026Procedure for Levying Compensation Charges for Additional Time to Achieve Milestones under the GNA Regulations, 2022
Consolidated copies, for reference (1)
Other copies of these documents (5)
- Dated 7 Jun 2022Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- Dated 1 Apr 2023Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023
- Dated 19 Jun 2024Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Second Amendment, 2024
- Dated 31 Aug 2025Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
- Dated 11 Nov 2026Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026
Earlier drafts
- Dated 27 Jan 2022Workshop notice on Draft Connectivity and General Network Access Regulations, 2021
- Dated 16 Dec 2021File: Connectivity and General Network Access to the inter-State Transmission System Regulations, 2021 — Draft
- Dated 16 Dec 2021Notice extending the date for comments: Public Notice on Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2021
- Dated 14 Jan 2022Notice extending the date for comments: Draft Connectivity and GNA Regulations, 2021 — Public Notice (Extension-I) — comments deadline extended
- Dated 26 Jan 2022Explanatory memorandum: Draft Connectivity and GNA Regulations, 2021 — Explanatory Memorandum
- Dated 16 Feb 2022Hearing notice: Public hearing notice on Draft Connectivity and General Network Access Regulations, 2021 — hearing 07.03.2022
- Dated 16 Feb 2022Notice extending the date for comments: Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2021 — Comments Deadline Extension-II, 2022
- Dated 27 Jan 2023Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023 — Draft
- Dated 27 Jan 2023Notice extending the date for comments: Connectivity and General Network Access (First Amendment) Regulations, 2023 — Public Notice — Draft
- Dated 13 Feb 2023Explanatory memorandum: Connectivity and General Network Access (First Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
- Dated 16 Feb 2023Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Connectivity and General Network Access (First Amendment) Regulations, 2023
- Dated 27 Feb 2023Hearing notice: Public hearing notice — Draft Connectivity and General Network Access (First Amendment) Regulations, 2023
- Dated 16 Feb 2024Connectivity and General Network Access to the inter-State Transmission System (Second Amendment) Regulations, 2024 — Draft
- Dated 16 Feb 2024Public notice: Connectivity and General Network Access (Second Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 5 Mar 2024Explanatory memorandum: Draft Connectivity and General Network Access to the inter-State Transmission System (Second Amendment) Regulations, 2023 — Explanatory Memorandum
- Dated 13 Mar 2024Hearing notice: Public hearing notice — Connectivity and General Network Access (Second Amendment) Regulations, 2024
- Dated 31 Jul 2024Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2024 — Draft
- Dated 31 Jul 2024Explanatory memorandum: Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Explanatory Memorandum — Draft
- Dated 31 Jul 2024Public notice: Draft Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Public Notice
- Dated 30 Aug 2024Notice extending the date for comments: Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Extension of comment deadline — Public Notice
- Dated 26 Sep 2024Hearing notice: Connectivity and General Network Access (Third Amendment) Regulations, 2024 — public hearing notice
- Dated 3 Mar 2025Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2025 — Draft
- Dated 3 Mar 2025Public notice: Connectivity and GNA (Fourth Amendment) Regulations, 2025 — Draft — Public Notice
- Dated 12 Mar 2025Explanatory memorandum: Connectivity and GNA Regulations, 2022 — Fourth Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 28 Mar 2025Hearing notice: Public hearing notice on Draft Connectivity and General Network Access (Fourth Amendment) Regulations, 2025
- Dated 15 Apr 2026GNA Milestone Extension Compensation Procedure, 2022 — Draft
- Dated 1 May 2026Notice extending the date for comments: Public hearing notice on GNA milestone-extension compensation charges under the Connectivity and GNA Regulations, 2022
- Dated 20 May 2026Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Fourth Amendment, 2026 — Draft
- Dated 20 May 2026Public notice: Connectivity and GNA (Fourth Amendment) Regulations, 2026 — Public Notice — Draft
- Dated 2 Jun 2026Hearing notice: Public hearing notice on Draft Connectivity and General Network Access (Fourth Amendment) Regulations, 2026
- Dated 16 Jun 2026Explanatory memorandum: Connectivity and GNA (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 22 Jun 2026Notice extending the date for comments: Connectivity and GNA (Fourth Amendment) Regulations, 2024 — comment deadline extension notice
- Dated 13 May 2026Hearing notice: Public hearing notice — GNA connectivity where PPA not signed within 12 months of LoA, 2026
16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.