Skip to content

CERC · Central Electricity Regulatory Commission

Treatment of GNA LoA-Route Connectivity Where PPA Not Signed Within 12 Months — Draft Order, 2026

Mechanism for treatment of connectivity granted under the GNA Regulations based on the LoA where the PPA has not been signed within a period of 12 months from the date of issuance of the LoA

Draft orderDated 6 May 202611/SM/2026 dated 06.05.2026

Draft

A proposal that has since been finalised as the Treatment of LoA-based Connectivity under GNA Regulations, 2026 — Order.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC Draft Order, Petition No. 11/SM/2026 — This is a draft order by the Central Electricity Regulatory Commission proposing a one-time mechanism for connectivity granted on the Renewable Energy Implementing Agency (REIA) Letter of Award (LoA) route under the GNA Regulations where the PPA has not been signed within 12 months of the LoA (p1). It is issued for stakeholder comments before a final order.

The main order (pp1–8) records the background: the GNA Regulations 2022 and their first three amendments; the LoA route intended to convert into PPA/PSA; the 25.11.2025 Staff Paper with three options; and comments from 30 stakeholders. It quotes the existing GNA provisions on withdrawal of applications, relinquishment and revocation of connectivity (pp2–5), and the Ministry of Power OM dated 16.04.2026 suggesting one-time surrender without BG forfeiture, auction of freed capacity, revenue to CTUIL and application to legacy LoAs as on 31.03.2025 (p5).

The Commission invokes Regulations 41 and 42 of the GNA Regulations and proposes the detailed mechanism in Annexure-I (pp6–7). It invites comments by 21.05.2026 and a public hearing by separate notice, and says a final order will follow (pp7–8). It also directs REIAs—NTPC, NHPC, SJVN and SECI—and CTUIL to furnish data on unconverted LoAs within specified days (p8).

Annexure-I (pp9–21) defines which entities are covered and requires CTUIL to publish a list; covered entities must choose within one month among three options. Option-I allows exit from the LoA route while retaining connectivity, subject to a performance bank guarantee and land, financial closure and COD milestones (pp9–12). Option-II allows substitution of LoA1 with a PPA under another LoA2, with limits on SCOD and NOC requirements (pp12–14). Option-III allows surrender of connectivity with return of Conn-BGs (pp14–15). Failure to choose is treated as Option-III (p15). Freed-up connectivity is first offered for reallocation in the same cluster and then auctioned; the Annexure sets auction modalities, bid security, milestone timelines and use of auction proceeds (pp15–20), with an illustration (pp20–21). Annexure-II (pp22–24) summarises stakeholder comments on the staff paper options.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document